ChargeLink

Electric and hybrid ferries

ChargeLink is a fully automated charger unit that delivers a reliable shore charging connection without any human intervention.
Tested in a real operational environment on an active ferry line.
Scalable to meet higher power and voltage requirements if needed.

5000 KW

1000VDC

Fully radio-controlled

AC/DC

50/60Hz

-30 C to +35 C
Different CONDITIONS OPTIONALLY

Features

  • Short connection time.
  • To be installed on a quay or on the ramp.
  • Charging capacity up to 5000 kW.
  • Adjustable to different voltage levels, AC/DC.
  • Automatic vessel movement compensation.
  • Automatic power disconnect when excessive ship movement is detected.

Powering sustainability worldwide

Explore our installations across the globe and see how ShoreLink is powering ports with sustainable solutions. From Europe to beyond, our projects showcase innovation in action — contact us today to learn more.

Want to learn more? Contact us

To reach Sales & Agents, Purchasing, Service, or Management, please use "Contact".

All contacts

    What solutions are you interested in?

    FAQ about ChargeLink

    What is the charging power ChargeLink can deliver?

    ChargeLink is designed to provide high-power “charging opportunities” during short stops, delivering up to 6,500 kW (6.5 MW). This enables electric ferries to recharge their batteries efficiently while passengers embark and disembark. For extended capacity or customized solutions, please contact the ShoreLink team.

    Is the system AC or DC?

    We offer both. The system is modular and adjustable to different voltage levels and can be configured for AC or DC charging, depending on the vessel’s onboard battery management system and grid infrastructure.

    Does the solution require any personnel on shore?

    ChargeLink is a fully automated plug-in solution. Using advanced sensors, it aligns precisely with the vessel’s socket and connects automatically. This eliminates the need for shoreside personnel to handle cables, enhancing safety and reducing operational costs.

    Can it be installed on existing ramps?

    The modular design allows for installation directly on the quay or integrated on the ferry ramp structure itself. It also features automatic compensation for vessel movement, ensuring the connection stays secure even if the ferry moves slightly due to waves or wind.

    Where are ChargeLink shore power installations located?

    ChargeLink solutions have been successfully delivered and implemented in multiple ports worldwide. Our reference projects include locations in:

    • Eckerö Line; Port of Tallinn, Estonia
    • Eckerö Line; Port of Helsinki, Finalnd

    We continue to expand our footprint in additional international markets.
    For detailed project references or case studies, please contact our team.